GRAVEL-LOK INSTALLATION INSTRUCTIONS - [ MOVE MOUSE ACROSS PICTURES ON THE LEFT TO ENLARGE ]


STEP 1: Excavate the job site. In most cases a depth of 4-5" is sufficient.  

STEP 2: Compact the sub-grade with a vibratory plate compactor.  

STEP 3: Layout geotextile fabric. This creates a barrier to prevent sediments from migrating up into the system and causing future settlement. TIP:
We Recommend DuPont Geotextiles

STEP 4: Install Cell-Tek LSG SERIES Load Support Grid. This reinforces the base material to prevent lateral movement. The cells should be infilled with an open aggregate infill equivalent to a #57 (3/4”) stone to allow for maximum permeability. The cell should be filled with about one inch overtop of the grid.

STEP 5: Install plastic or aluminum edging (optional). This creates a clean edge to define the shape of the pavement's final contours.  

STEP 6: Cover with decorative stone. Spread, level and tamp to prepare for final process.

*NOTE: Decorative stone must be cleaned and dried before spreading*

STEP 7: Apply Gravel-Lok aggregate bonding liquid. Gravel-Lok will cover rates vary depending upon installation method, application and stone size. Call (888) 851-0051 for further guidance. Keep in mind more Gravel-Lok can always be applied later if needed. It is also important for the system to be completely dry prior to installing the Gravel-Lok.
 
E-Mail Newsletter
» Sign up for info & updates from Cell-Tek
» call: 888.851.0051
» e-mail: info@celltekdirect.com
  Cell-Tek Blog Cell-Tek on Facebook Cell-Tek on YouTube Cell-Tek on Linked in Cell-Tek on Twitter
©2011 Cell Tek LLC. ALL RIGHTS RESERVED